Energy Research Institution
THE CHALLENGE
The client needed to effectively segregate areas within their workshop for inspection purposes – specifically, to separate the inspection room from the main workshop area. The intention was also to provide a clear view from the viewing area to align with the overall appearance of the new building.
THE SOLUTION
Double-Skin Insulated Partitioning was recommended, including the following features to meet the specific need:
- Full height glazing to allow clear vision into the inspection rooms.
- Full height glazed doors.
- Colour-coded doors and trims to match the overall wall appearance.
MORE DETAILS
Installation duration: 2 days
Size: L-shaped partition, 3.5M x 6.5M, 2.44M high
Market Category: Energy