Energy Research Institution

THE CHALLENGE

The client needed to effectively segregate areas within their workshop for inspection purposes – specifically, to separate the inspection room from the main workshop area. The intention was also to provide a clear view from the viewing area to align with the overall appearance of the new building.

THE SOLUTION

Double-Skin Insulated Partitioning was recommended, including the following features to meet the specific need:

  • Full height glazing to allow clear vision into the inspection rooms.
  • Full height glazed doors.
  • Colour-coded doors and trims to match the overall wall appearance.

MORE DETAILS

Installation duration: 2 days
Size: L-shaped partition, 3.5M x 6.5M, 2.44M high
Market Category: Energy

Image Gallery

CLIENT TESTIMONIAL

We found DBC Industrial a pleasure to work with. I’m really happy with the partitions you installed. I’ve had no negative comments at all – everyone agrees they look great. Despite our tight budget and shifting timelines, you were so accommodating and managed to deliver a fantastic result. The installation was incredibly quick, I couldn’t believe how fast it went up! It’s been such a positive experience that when another division in our building needs to create an office space, I’ll be recommending your company to them.

Manufacturing Specialist Team Leader

DO YOU HAVE A PROJECT? NEED SOME ADVICE?

GET IN TOUCH