Exeon Ltd

THE CHALLENGE

Exeon was tasked with installing an odour extraction and treatment system at their client’s food waste processing plant, where managing dust and odours was a key operational challenge. To make the system as efficient and cost-effective as possible, they needed to contain a specific section of the odorous process rather than extract air from the entire facility. This meant creating a defined, enclosed area that would allow for more targeted extraction, helping to improve overall system performance while maintaining a controlled working environment.

THE SOLUTION

We recommended our Durascreen® product in grey PX1000 material.

Features included to meet specific need:

  • The partitioning system is comprised of a series of prefabricated panels, enabling efficient installation and a consistent finish throughout.
  • Panels were connected using a dust-tight Vee join system, helping to contain dust and odours, and maintain a controlled environment.
  • UPVC strip curtain doorways were installed for forklift truck access, allowing smooth movement while maintaining separation between areas.
  • Pedestrian doors were incorporated for pedestrian access, ensuring safe and convenient personnel flow.
  • A bespoke mullion frame with UPVC inserts was designed and installed, carefully cut around protruding sorting machinery to maintain a sealed and functional layout.
  • Steel mullion posts were added to provide a clean, neat finish at corners and junctions.
  • A floor-mounted purlin was installed to raise the bottom section of the Durascreen panels, preventing contact with floor sludge and helping to protect and preserve the fabric over time.
  • All necessary supporting steelwork was included at the top of the partitions, along with steel corner posts for added strength and stability.

MORE DETAILS

Installation duration: 5 Days
Size: L 24.5m (L-shaped) x H 8.5m to 9.5m
Market Category: Waste and Recycling

Image Gallery

CLIENT TESTIMONIAL

The main installation went really smoothly and was finished even faster than I anticipated. We’re very pleased with how it went.

Carl Packeer, Project Manager