Hartmann

THE CHALLENGE

Hartmann needed a more cost-effective and convenient way to divide their warehouse, as they wanted to rent out the unused space. They were looking for a practical solution that would allow them to make better use of the facility while keeping operations efficient.

THE SOLUTION

Durascreen® was recommended in our CFG 402 PU coated glass cloth material, to comply with landlord / fire safety requirements.

Features included to meet specific need:

  • 1x Large opening for client’s rapid door.
  • 1x Bespoke fire door to create a safe fire exit route.

MORE DETAILS

Installation duration: 8 days
Size: L 82.5m x H 8m
Market Category: Medical Equipment Manufacturing

Image Gallery

CLIENT TESTIMONIAL

You asked us what we needed and helped design the right solution. The drawings and design pack were very helpful, giving me the chance to check everything before the work went ahead.

The installation was completed ahead of schedule, and the work under the mezzanine even caught public interest when I shared images. Everything went smoothly with your team and I’ve no complaints.

Ross Johnson, Project Manager

DO YOU HAVE A PROJECT? NEED SOME ADVICE?