THE CHALLENGE
The logistics provider company needed to carry out works within a large warehouse while maintaining a safe working environment for their staff. In addition, it was essential to control dust within the work area to prevent contamination and ensure cleanliness throughout the facility.
THE SOLUTION
We recommended using the PX1000 material in light grey to create a dust-tight screen across the warehouse. To accommodate the large screen size and prevent issues caused by air pressure differences, pressure relief flaps were integrated into the design.
For convenient access, the installation included three double pedestrian doors and one large 3m x 3m frame to allow equipment and personnel to move safely and efficiently between work zones.
MORE DETAILS
Installation duration: 3 weeks
Size: 185.6m long (across 6 warehouse bays) and 16.35m high at the apex of each bay