Menzies Distribution

THE PROBLEM

Menzies needed 2 enclosures installed within a short period of time to surround floor slab repairs inside a warehouse used for storage of food products.

THE SOLUTION

Durascreen flexible partitioning was recommended in PX 1000 material.

Features included to meet specific need:

  • Our unique V-join joining system to ensure a dust tight seal between walls.
  • Foam infills between the partition and roof panels to create a further dust tight seal where the screen met the roof panelling.
  • PVC Strip curtains within door framed openings to allow easy movements of plant (dumpers /excavators)
  • ‘Roll up’ panels with Velcro seams to allow large openings for occasional use – for access for cement mixing trucks.

MORE DETAILS

Installation duration: 10 Days
Size: 2 walls created to surround civil works.
The first wall formed a 5-sided enclosure of 79m perimeter with heights up to 15m.
The second wall formed a 3-sided enclosure of 67m perimeter with heights up to 12.2m.
Product used: PX1000 Fabric
Market Category:Logistics

CLIENT TESTIMONIAL

I was involved at design stage through to site installation, the site installers were a pleasure to work with and we would definitely use DBC Again and recommend them to anyone looking for this kind of service.

Paul Carter, Senior Contracts Manager