Oakway Storage

THE CHALLENGE

Oakway Storage needed to separate day-to-day trunking activities – including frequent loading and unloading of Arctic lorries – from areas designated for storage contracts, including sensitive food ingredient products. One of their key challenges was maintaining a clean, dry, and more or less, airtight environment for a major storage client, whose contract occupied around one-third of the warehouse space and came with strict requirements. To meet these operational demands, they required the installation of an airtight wall to divide the logistics zone from the food storage area.

THE SOLUTION

Our Durascreen® product was recommended in blue PX1000 fabric for aesthetic reasons.

Features included to meet specific need:

  • Blue fabric wall to match site corporate colour.
  • V-overlap for a dust-tight join.
  • Framed door openings for client to install their own rapid doors into.

MORE DETAILS

Installation duration: 1 week
Size: L 87m x H 11.4m to 13.8m
Market Category:Logistics, Warehousing, and Storage
Fabric type: PX1000 (blue)

Image Gallery

CLIENT TESTIMONIAL

The project management team were very hands-on and supportive throughout, always available when needed, which made a real difference. When I visited the site just three days into the install, your team had already made electrifying progress. Everyone on site was genuinely impressed by how quickly things were moving, especially considering the size of the wall – it completely changed the feel of the space. By the time I returned, they were finishing up the 3M door. It was a smart, tidy job – tight finish, great colour. I’ve already said – I absolutely recommend DBC.

Edward Fennell, Project Sales

DO YOU HAVE A PROJECT? NEED SOME ADVICE?

GET IN TOUCH