OPmobility

THE CHALLENGE

OPmobility needed to keep their paint load area clean and sealed to stop dust and contaminants from affecting production quality. Since even small amounts of dirt could ruin painted parts, maintaining a controlled environment was essential.

However, the space wasn’t fully enclosed – gaps around the ‘transtocker’ allowed dust to get in, and the positive air pressure system wasn’t enough to keep it out. To solve this, they needed a stronger walling solution to properly isolate the paint area and protect it from airborne contamination.

THE SOLUTION

Our Durascreen® product was recommended in PX1000 in a translucent colour, to match the previous install, and allow for use in tight corners.

Features included to meet specific need:

  • Dust tight V-overlap joining system to contain dust.

MORE DETAILS

Installation duration: 15 days divided into 3 visits
Size: Total length of 40.53m and heights between 11.56m – 12.16m
Market Category: Automotive

Image Gallery

CLIENT TESTIMONIAL

Working with DBC has been a really positive experience from start to finish. The whole process – from the initial discussions with the sales team through to operations, project management, and installation – was handled with genuine professionalism and care. Communication was clear and consistent throughout, and everything ran smoothly, especially considering the project was handed over to me from a colleague you had originally spoken with.

The installation team, in particular, were excellent – efficient, knowledgeable, and proactive in resolving any issues before they became problems. There were no hiccups at all! They showed great diligence by checking key details ahead of their final visit, which saved time and kept the project on track. Overall, it was a seamless, well-managed process, and the team deserves full credit for their thoroughness and professionalism.

Stuart Harrison, Injection Manufacturing Engineer