Overbury
THE PROBLEM
Overbury needed temporary walling to contain dust on site whilst sandblasting a brick wall they wanted to return to face-brickwork
Wall was needed at short notice and needed to have ability for dust and odour extraction systems to be installed through the wall
THE SOLUTION
Durascreen® was recommended in our PX520 fabric in yellow.
Specific elements included to meet Overbury’s requirements:
- V-overlap joining system to contain dust
- Foam infills to ensure a dust-tight seal
- Durascreen® draw-aside curtain with cleats to fasten it closed when not in use
MORE DETAILS
Installation duration: 3 Days
Size: W51m x H6.8m
Product used: PX520 Fabric
Market Category: Corporate / Commercial refurbishment