Rose Calendars

THE CHALLENGE

Rose Calendars required a partitioning solution within their facility that could be installed efficiently around their existing operations.

The project presented the challenge of coordinating site access and deliveries while working around the customer’s operational schedule. The solution therefore needed to be professionally installed with minimal disruption to ongoing operations, while ensuring the finished system met the client’s requirements.

THE SOLUTION

Our Durascreen® Flexible Partitioning System was installed to provide the required separation within the facility, with the DBC team coordinating closely with Rose Calendars throughout the installation.

Features included to meet specific needs:

  • Bespoke Durascreen partitioning system designed to meet the customer’s site requirements.
  • The installation took place over 3 consecutive weekends to coordinate around site access to minimise disruption to ongoing operations.
  • Includes two single-skin steel sliding doors complete with frame, providing convenient access through the partition while maintaining the required separation.
  • Includes PVC windows to provide visibility and natural light throughout the space.

MORE DETAILS

Installation duration: 6 Days (3 consecutive weekends)
Size: Total L 36.6m x H 4.3m to 5.76m
Market Category: Commercial Printing / Corporate Merchandise

Image Gallery

CLIENT TESTIMONIAL

The installation went very smoothly from start to finish. Paul was excellent throughout and kept in regular contact with us before each weekend to ensure everything was arranged and the site was ready for him. The work was completed efficiently, professionally and on time.

What we particularly appreciated was the team’s reliability. Compared with some other companies we’ve worked with, DBC turned up when they said they would, communicated well and got the work completed without any unnecessary disruption to our operations.

There was a minor adjustment needed to one of the doors after installation, and the team responded promptly, returned to site and resolved it quickly. We really appreciated how responsive and helpful they were, and the door is now working exactly as it should.

Overall, we’ve been extremely happy with the installation and the service we’ve received from DBC. The team has been professional, reliable and responsive throughout, and we’d be more than happy to recommend DBC to others or provide a reference.

Mark Shipley, Operations Director