SHD Composite Materials Ltd

THE CHALLENGE

SHD required an internal partitioning solution to create effective separation between different engineering activities within their facility.

The site is used for the manufacture and assembly of machinery, with welding and grinding activities taking place alongside assembly and commissioning work. SHD needed to prevent dust and contamination generated within the welding and grinding areas from transferring into the cleaner assembly section, particularly when newly built machinery was being commissioned.

The solution therefore needed to clearly segregate these processes while allowing the different engineering activities to continue operating efficiently with minimal disruption.

THE SOLUTION

Our Durascreen® Flexible Partitioning System was installed to separate the assembly area from the welding and grinding sections of the facility.

Features included to meet specific needs:

  • Bespoke internal partition designed to separate cleaner assembly operations from welding and grinding activities.
  • V-join system is used to connect the partition sections and maintain a secure and consistent enclosure.
  • Insulated finishing at high level to provide a more complete separation between the divided areas.
  • PVC vision panels incorporated at high level to maximise the flow of natural light between work areas.
  • Zip access panel incorporated to provide occasional access for the movement of large machinery, equipment and plant between partitioned areas when required, while keeping the partition closed during normal operations.
  • Steel sliding door provided easy access for personnel and equipment while making efficient use of the available space.

MORE DETAILS

Installation duration: 6 Days
Size: Total L 22.36m x H 7.15m
Market Category: Composite Materials Manufacturing

Image Gallery

CLIENT TESTIMONIAL

The installation went pretty seamlessly. The team turned up as planned, did a great job and were professional throughout. Overall, we were very happy with how everything was handled.

The team were very responsive throughout the installation, and when a small section of insulation foam needed to be completed at the top, they arranged for it to be delivered and fitted just a couple of days later. We really appreciated how quickly this was addressed and how smoothly everything was completed.

We needed to separate the assembly section from the welding and grinding areas to prevent contamination transferring across when commissioning machinery, and the wall has provided exactly the separation we needed.

We’re very happy with the finished result and are already looking at another potential project at a new site in the next couple of months.

Alec Doughty, Group Production Director