TDP

THE CHALLENGE

TDP required an effective solution to reduce noise levels within their facility while also improving environmental control between work areas. In addition to reducing noise, they wanted to create separate zones that would improve heating efficiency, helping to maintain a warmer, more comfortable working environment during the winter months.

THE SOLUTION

Our Durascreen® Flexible Partitioning System was initially considered as a full fabric partition. Following discussions during the design stage, DBC recommended a Double-Skin Steel Partitioning solution, offering enhanced acoustic performance while supporting the customer’s energy efficiency objectives.

Features included to meet specific needs:

  • Double-skin steel partition designed to significantly reduce noise transfer between operational areas.
  • Zoned layout to improve heat retention and support a more energy-efficient workspace.
  • Bespoke design developed through close collaboration to ensure the most suitable solution for the application.
  • Integrated strip curtain access to maintain workflow while preserving separation between zones.
  • Professionally installed system delivered with minimal disruption to daily operations.

MORE DETAILS

Installation duration: 1 Day
Size: Durascreen at L 12.6m x H 3m; Steel Partitioning from floor to 3m high
Market Category: Sustainable Manufacturing and Commercial/Garden Furniture

Image Gallery

CLIENT TESTIMONIAL

The product has made a massive difference to noise levels. Since zoning the areas, we’re also expecting improved energy efficiency and a much warmer working environment during the winter.

From the beginning, the advice and recommendations from DBC were invaluable. I originally wanted a full fabric partition, but the recommendation to use a double-skin steel solution made a massive difference.

The installation team was really helpful, polite and professional. They kept everything clean and explained exactly what they were doing throughout the installation.

It’s a brilliant quality product. I don’t really think there’s anything else that could be improved, and I’d certainly recommend DBC to anyone looking for a similar solution. We’d definitely consider working with them again in the future.

Luke Barlow, Operations Director