Vehicle manufacturer, Solihull

THE PROBLEM

The vehicle manufacturer needed a temporary enclosure to prevent dust contamination of vehicle panel storage while they removed / repaired a concrete floor slab.

THE SOLUTION

Durascreen temporary walling was recommended in PX520 material.

Features included to meet specific need:

  • Wall weighted to floor slab eliminated the need for floor fixings, to preserve existing floor slab.
  • Durascreen draw-aside curtain for easy access in and out of the areas but also dust tight seal.
  • PX520 budget fabric was ideally suited to the temporary nature of this wall.

MORE DETAILS

Installation duration: 4 Days
Size: 4-sided enclosure; 67 linear metres, 10m high
Product used: PX520 Fabric
Market Category: Automotive Manufacturing

Image Gallery

CLIENT TESTIMONIAL

I was pleasantly surprised that you were able to deliver & install it in such a short time, with very little notice, and the alternative cost we had off another vendor proved that your quote provided us with value for money. You have also been very accommodating (from what I can see) in working through the building team.

Taking all this into account, I am very pleased and would have no hesitation in recommending you for future works.

Lead Infrastructure Engineer