Westcolour

THE CHALLENGE

Westcolour needed support in creating a secure, concealed, and controlled environment within a busy production facility. With a new high-value print machine arriving, they required a dedicated room that could protect the equipment, maintain stable conditions, and ensure security from frequent in-and-out activity. The challenge was to build a discreet, air-conditioned, sound-controlled space with lockable access — all without disrupting existing operations.

THE SOLUTION

Our Durascreen Flexible Partitioning System was recommended and specified using our PX1000 material, finished in a dual-colour scheme — blue on the lower section and light grey on the upper section.

Features included to meet specific needs:

  • Two-sided Durascreen enclosure designed using prefabricated PX1000 panels, connected through our dust-tight Vee join system to ensure a clean and contaminant-controlled partition.
  • High tensile steel cables and supporting steelwork were included to provide tension, stability, and a neat, taut finish across the structure.
  • Dual-colour layout (blue base with grey upper section) selected not only for visibility and organisation but also to deliver a clean, modern industrial-sector aesthetic consistent with professional manufacturing environments.
  • Vision panels strategically incorporated to maximise visibility and allow safe monitoring of activity inside the enclosed area.
  • Pedestrian access door supplied to support safe and convenient personnel movement.
  • Bi-parting sliding door for equipment and forklift access, ensuring smooth operational flow.
  • Branded logo prints for a professional, customised finish.

MORE DETAILS

Installation duration: 5 Days
Size: L 39.925m x H 6.381m to 8.371m
Market Category: Print, Mailing and Fulfilment Services

Image Gallery

CLIENT TESTIMONIAL

Our plans initially involved constructing a full building structure around the press, so when we shifted to a partition system, we thought we might be downgrading to a lesser-quality solution. However, this has been far from the case. We are extremely pleased with the quality and workmanship delivered by the DBC team. The system has allowed us to maximise the use of the area, and it integrates seamlessly with the rest of the factory while still providing the departmental separation and security we needed. A job very well done!

Andrew Bowden, Managing Director